Production Planning or PP is a core SAP module. As the name suggests, SAP PP is all about planning the manufacturing process. In more precise words, SAP created the SAP production planning module for supply chain planning, which covers areas such as customer requirement management, production planning in a plant, requirement forecasting, quantity and capacity requirement planning, material requirement planning, and production processing.
All the areas mentioned above are categorized under the PP domain, and it is integrated with other SAP modules. This interconnected network of functions and components is the building block of the SAP ERP system. SAP PP supports three manufacturing methods. These include discrete manufacturing, process manufacturing, and repetitive manufacturing.
Each of these manufacturing methods has its process, which provides unique functionalities to the respective industries. But the core concept in all the ways is based on supply chain management. Supply chain management is about directing the flow of goods and transforming raw materials into finished products. Let us now get into what is SAP PP.
WHAT IS SAP PP - Table of contents |
|
What is SAP PP?
SAP Production Planning or SAP PP is the ERP Central Component (ECC) component that helps businesses plan with the manufacturing, sale, and distribution of goods. A part of SAP ECC's logistics function, SAP PP plays a vital role in a manufacturer's supply chainand integrates with other ECC components. This includes materials management, sales and distribution, plant maintenance, quality management, finance, controlling, and human resources. SAP production planning module activities includematerial requirements planning, bill of material, routings, and capacity planning.
Everything in SAP PP revolves around master data stored and manipulated in centralized master data tables. Master data types include materials master, work center, BOM, and routing. The master data is used to create transactional data in SAP ECC, such as making a production order in production planning, a sales order in sales and distribution, or a purchase order in materials management.
For example, when a production order is created in SAP PP, it uses master data from SAP materials management about the raw materials needed to produce the finished product, which will subsequently be used to create a sales order in SAP SD. On the other hand, SAP PP sub-modules includesales and operations planning along with long-term planning, data management, master production schedule/material requirements planning capacity requirements planning, and shop floor control and information systems.
SAP production planning module or SAP PP module can be configured to meet various industry requirements and includes modules supporting specific manufacturing industry types, includingdiscrete manufacturing, repetitive manufacturing, and process manufacturing. In discrete manufacturing, the number of goods produced changes by lot, and costs are calculated by orders and lots.
Inrepetitive manufacturing, products remain unchanged over long periods, and production occurs in total quantities, not individual lots. In process manufacturing, products are manufactured in batch-sized lots using a process described in a master recipe that can be adjusted for separate batches. Process manufacturing is mainly used in the chemical, pharmaceutical, and food and beverage industries.
Want to become a Certified SAP Professional? Visit here to learn about SAP PPTraining
What is Production Planning?
Now that we have a detailed overview of what is SAP PP, let us talk about production planning. Production Planning is a method which aligns demand with manufacturing resources by establishing production and supply plans for finished goods and parts. SAP production planning module is an important module. This is because it tracks and records the expected and actual costs of the manufacturing process. It is fully compatible with SAP's other modules such as SD, MM, QM, and FICO & PM.
Organization Structure in SAP PP
After having a look on what is SAP PP production planning and production planning, it is time for its organizational structure. The system's manufacturing plant locations and storage inside the plants should be accessible in every live production planning module.
Let us look at the importance of production planning of plant and storage locations-
- All master production data is produced at the plant level.
- At the plant level, planning activities are also carried out.
- The production confirmation process and the related movement of goods occur at the plant and storage site stage.
Master Data in SAP PP
Now that we know what is SAP production planning, let us dive deeper for a better understanding of how this works. Generally, master data is immutable for any enterprise and, depending on necessity is rarely altered. In the production preparation module, we need to preserve five master details.
- Material Master - The commodity master includes details on all the goods a corporation procures, manufactures, processes, and distributes. It is a number that uniquely distinguishes a record of the material master and, thus, a material. Materials are grouped with the same essential characteristics and assigned to a category of materials such as finished materials, raw materials, etc. It is used for purposes like purchasing materials, for Goods Flow postings, such as the receipt of goods in inventory management, and for physical inventory postings, verification of invoices for invoices, sales, and distribution process for the fulfillment of sales orders, and for preparing and monitoring content specifications for planning, arranging, and verifying production procedures.
- Bill of Material - The material bill is a complete, formally organized list of the components and the quantity needed for creating or assembling the product. BOMs are used in the planning and costing of material specifications. You can also build up to 99 alternate BOMs for a single commodity. For goods with variants, you can build Super BOM, which has all possible components to manufacture various variants. The suitable part is selected based on the sales order characteristics. For example, all types of frames (with different colors and sizes) can be used in the Product Cycle, and the desired structure is selected by production order based on the color and size chosen in the order of sale.
- Work Center - A Work Center is a system or collection of machines in which manufacturing processes are performed. Job centers are included in the worklist events (Routings). It provides the details for scheduling, capacity, and costing.
- Routing - Routing is nothing but a series of procedures done at the Job Site. It specifies the system time, work time, etc., for the execution of operations.
Check Out: SAP PP Interview Questions
Production Planning Cycle
After going through what is SAP production planning, it is the turn to discuss production planning cycle. This cycle consists of two parts – planning and execution.
- Planning - Generally, development planning is carried out using a budgeted revenue schedule. According to the production cycle periods, Preparation is based on the Sales Schedule to fulfil the sales demands. In the type of expected independent need, demand for the commodity is entered by demand management This demand management data becomes the Commodity Requirement Preparation input. Using the master data such as Bill of Material (BOM) and usable existing plant stocks, MRP tests for the supply of various raw materials required for manufacturing at different times. In supply shortages, procurement specifications are produced for commercially procured products, and expected orders are created for in-house assembled materials. These purchase requisitions and planned orders will initiate the procurement and production cycles. Since MRP works with infinite capabilities, to avoid any capacity bottlenecks, capacity levelling must be don
- Execution - These planned orders are translated to production orders and scheduled per the production timings using master data such as routings. Production orders are issued on the shop floor by the Production Supervisor, and material availability checks can also be performed to check whether any missing components are present. Output is carried out based on routing activities where master data is identified against each routing activity, such as the Work Center. If the product has been completed, the order confirmations are carried out, and products for material use and receipt of goods are put against the order. The order is then given the Delivered (DLV) status, and the material is received at the desired storage place.
Demand Management
Demand Management's role in SAP production planning process flow is to forecast amounts of demand and distribution dates for finished goods and essential assemblies. PIR (planned autonomous requirements) and consumer requirements are used in Market Management. Planning methods for a commodity must be established. It reflects the processes of development for planning and output. There are two ways to do this.
- Make to Stock - The manufacturing of goods without orders for sale, i.e., storage, is carried out independently of orders.
- Make to Order - This technique refers to manufacturing material for a particular order or line object.
Material Requirement Planning (MRP)
Material Requirement Planning identifies any shortages and produces the appropriate procurement components. It calculates net requirements, generates planned orders for in-house manufactured materials, and requires raw materials for purchase. It schedules lead time and calculates planned orders for production dates. It blasts the BOM and produces tender proposals at each stage of the BOM
Capacity Planning and Levelling
Capacity Preparation’s role in SAP production planning process flow is to assess overloads of work center capacity and shift orders to avoid any bottlenecks. MRP creates capacity requirements in the Work Center because MRP operates with unlimited capacity without considering any capacity limitations and schedules all on the work center. It is needed to level the capability at the work center. Each work center's capability can be balanced via a planning table to create a restricted production schedule.
Production Orders
The output of the MRP would be "planned orders," which need to be converted to production orders for further implementation of the process. The Production Order is a signature receipt feature that is not influenced by the MRP run than the Planned Orders.
The Production Order specifies the material and quantity to be produced. It also includes the BOM components and the details of the routing procedure to be performed at the work center. The manufacturing order shall be issued for execution, and the material supply controls shall be carried out to determine if there are any missing parts.
Production Order Confirmation
When products are physically assembled on the factory floor, the order for production must be checked. During confirmation, components can be consumed automatically using a back-flushing system, and products can be collected automatically using a Control Key in the routing service. However, manual issues and receipt of products may be done separately from confirmation instead of the movement of automotive goods.
Any failure to move goods due to a component supply shortage can be reprocessed manually. Activity costs, such as equipment, labor, etc., will also be changed on a factual basis in the manufacturing order during validation. After final confirmation and delivery of the objects, the order shall be granted the status of CNF (Confirmed) and DLV (Delivered). If the warranty is incorrectly posted, we can cancel and post the confirmation with the correct data again.
Production Order Close
The order should be technically completed after the production order has been, or we wish to refrain from proceeding with the demand. It is deleted from the stock/requirement list after the order has been granted TECO status and is no longer considered in planning the material requirement. All dependent reservations will also be deleted from the system.
Conclusion
We need to move on with the rapid technological advancement and acquire the required skillset to keep up with the ongoing market trends and market competition. SAP production planning or SAP PP has made this shift easier. Let us take the example of accounting industry, there, SAP has taken the role of other coding software. SAP production planning process flow has brought the master data of industries in the simplest form. SAP has grown in the international market, thereby increasing the demand for SAP PP professionals in Indian industries as well. Also, due to the switch from offline to online SAP PP continues to grow popular in various arenas of life.Want to become a Certified SAP Professional? Visit here to learn about SAP PP Training
About Author
Madhuri Yerukala
Madhuri is a Senior Content Creator at MindMajix. She has written about a range of different topics on various technologies, which include, Splunk, Tensorflow, Selenium, and CEH. She spends most of her time researching on technology, and startups. Connect with her via LinkedIn and Twitter .
FAQs
What is SAP PP? | SAP PP Tutorial? ›
SAP PP (Production Planning) is a SAP modules, specially designed for integrating different department involved in production and manufacturing. This tutorial explain some important components of SAP PP like Data Center, BOM, Work Center, CRP and so on.
What is the PP process in SAP? ›What is SAP PP? The Production Planning (PP) module enables production planning based on both market demand and production capacity. PP creates schedules for production, for procurement and for purchasing. This ensures that raw materials are available for production as required.
Who can learn SAP PP? ›- Business knowledge in the area of Production Planning & Manufacturing.
- 1-3 years domain experience in Production planning / Manufacturing required.
- Any graduate or post graduate.
- Good communication skills.
As an SAP PP Consultant you will be part of a team responsible for delivering large-scale, complex projects that combine processes with technology to help our clients achieve their business objectives.
What are the skills required for SAP PP? ›- Technical Communication: Communication is important in every facet of life, more in Consulting. ...
- Teamwork. ...
- Design Thinking Skills. ...
- Studying. ...
- Domain Knowledge. ...
- Problem-solving & Technical Skills. ...
- Pitching. ...
- Project Management Skills.
- Sales orders.
- Planned independent requirements.
- Planned orders.
- Production orders.
- Project orders.
- Maintenance orders.
- Purchase requisitions.
- Stock transport requisitions.
In simple words, SAP PP is a one-point solution for businesses to plan the manufacturing, distribution, and sales of goods. SAP PP integrates with supply chain entities including procurement, inventory control, and sales & distribution, and aids in production flow optimisation, material tracing, and strategy planning.
Is SAP PP easy or hard? ›No, It Not Hard to learn but you need to give daily 2(two) hours. Practice as much as you can. First of all, I need to say there is a clear and straightforward solution to how to become proficient. I've written a post about this and you can read it here How to become an SAP consultant.
Is SAP PP a good career? ›SAP PP module certification can help candidates aspire for lucrative job opportunities as senior consultants, SAP Production Planning Consultants, assistant managers, and senior-level managers.
How many days will it take to learn SAP PP module? ›S. No. | Top SAP Courses/Certifications | Duration |
---|---|---|
6 | SAP MM (Material Management) | 160 Hours |
7 | SAP PP | 160 Hours |
8 | TS4F01 Financial Accounting in SAP S/4HANA - Academy Part I | 80 Hours |
9 | PM Business Processes in Plant Maintenance | 128 Hours |
How to implement SAP PP? ›
- Project Preparation/Planning. This is the start phase we were talking about earlier that leads to the SAP implementation project failure. ...
- Business Blueprint. ...
- Realization/Implementation. ...
- Integration Tests. ...
- Preparation. ...
- Go-live. ...
- Production/ GO Live Support.
SAP PP Consultant salary in India ranges between ₹ 2.1 Lakhs to ₹ 10.5 Lakhs with an average annual salary of ₹ 4.8 Lakhs.
What is the difference between SAP PP and SAP PI? ›PP is the traditional components ensambled production process that, in theory, you can reverse the process to obtain the components. I.e: a computer. PP-PI is the processes industry where if you reverse the product (in theory, for sure), you CANNOT obtain its components separately.
How do I start a career in SAP PP? ›- Obtain SAP training and certification. Choose the module you want as a career, find an SAP course for it, and get certified by an authorized SAP training partner. ...
- Work with a consulting company. ...
- Work as a trainee in SAP support. ...
- Join an SAP project as a non-SAP person.
Within SAP production planning modules there are five key master data elements to be maintained: Material Master, BOM, Work Center, Routing, and Production Version.
How do you put SAP skills on a resume? ›- Choose a format and header. ...
- Write a professional summary. ...
- List your experience. ...
- Focus on your unique accomplishments. ...
- Describe your skill set. ...
- Include professional organizations and activities.
Different order types can result in vastly different outcomes so it's important to understand the distinctions among them. Here we focus on three main order types: market orders, limit orders, and stop orders—how they differ and when to consider each.
What are the three types of orders? ›The most common types of orders are market orders, limit orders, and stop-loss orders. A market order is an order to buy or sell a security immediately.
How many types of industry are there in SAP PP? ›Based on different nature of products and complexity, there are 3 types of manufacturing process followed in SAP PP: Discrete Industry. Process Industry. Repetitive Industry.
How SAP is used in purchasing? ›SAP procurement allows customers to immediately respond to the changes in the supply demands and the market conditions. It enables us to simplify demand planning through the connected processes.
Why order type is required in SAP PP? ›
When you create a Production Order, type is defined in SAP PP system. To start the production process, it is necessary to issue a Production order. Till a production order is not released, the execution of production process does not start.
What are the 3 main benefits of SAP implementation through Activate? ›Using three key components—ready-to-run business processes, guided methodology, and tools for adoption and extensibility—SAP Activate aims to simplify implementation processes and help users build strong landscapes.
Can I learn SAP at home? ›openSAP delivers innovative learning for everyone with expert-led content, made for you by SAP. Learning is lifelong, and with our free online learning available globally, you can upskill wherever and whenever you need it.
Can a beginner learn SAP? ›This is SAP online training for beginners. The ideal course for people who want to start working on SAP systems in offices and develop their professional career in the SAP field. You already know that the demand for SAP is growing. So it is worth a try!
What are the modules in SAP PP? ›SAP PP sub-modules include sales and operations planning (S&OP), long-term planning (LTP), data management (DM), master production schedule/material requirements planning (MPS/MRP), capacity requirements planning (CRP), shop floor control and information systems.
How much does SAP PP pay in USA? ›The average SAP MM/PP Consultant salary in the United States is $96,717 as of May 01, 2023, but the salary range typically falls between $83,718 and $110,866.
Which SAP has highest salary? ›1. SAP S/4HANA (High-Performance Analytic Appliance)
Which job has highest salary for SAP? ›Designation | Average Salary Yearly Yearly Monthly |
---|---|
Senior Consultant (5 - 16 yrs exp) | ₹ 22,51,207/yr (₹7.4L/yr - ₹39.4L/yr) |
Quality Specialist (4 - 9 yrs exp) | ₹ 16,67,496/yr (₹10.4L/yr - ₹28.0L/yr) |
Senior Software Engineer (4 - 12 yrs exp) | ₹ 19,06,840/yr (₹6.0L/yr - ₹35.0L/yr) |
In general, the duration of an SAP PP course ranges from 50 to 70 days while SAP PP Course Fees vary from INR 25000 to INR to 3 lacs. But at eLearning Solutions, the fee is only 25000 INR per student.
Which SAP module is best for beginners? ›- SAP Material Management (MM) SAP's Material Management module concerns the movements of the materials. ...
- SAP Human Resource (HR) SAP's Human Resource module concerns data management and work process within the human resource department. ...
- SAP Financial Accounting (FI) ...
- SAP Controlling (CO)
Does SAP PI PO require coding? ›
With SAP PI/PO, users implement interfaces seamlessly and developers can create three-to-end integration flows (iFlow) with minimal coding using a user-friendly interface.
What are the 5 phases of ASAP methodology? ›- What is the ASAP Methodology Framework? ...
- Phase 1: Project Preparation. ...
- Phase 2: Business Blueprint. ...
- Phase 3: Realization. ...
- Phase 4: Final Preparation. ...
- Phase 5: Go Live and Support. ...
- Advantages of ASAP Methodology. ...
- Conclusion.
Master data contains the main detailed objects in SAP Production Planning module. In SAP PP, main objects are Bill of Materials, material master, routing, and work center.
What is the salary of SAP PP in Deloitte? ›The estimated take home salary of a SAP PP QM Consultant at Deloitte ranges between ₹ 84,685 per month to ₹ 86,900 per month in India.
How much does a SAP PI Consultant earn in USA? ›Annual Salary | Weekly Pay | |
---|---|---|
Top Earners | $176,500 | $3,394 |
75th Percentile | $145,000 | $2,788 |
Average | $124,353 | $2,391 |
25th Percentile | $103,500 | $1,990 |
- Complete a relevant bachelor degree in information technology, computer science or computer engineering. ...
- Get additional training in SAP. ...
- Gain extensive industry experience. ...
- Consider completing a masters degree to advance your career.
Definition. A production version determines which alternative BOM is used together with which task list/master recipe to produce a material or create a master production schedule. For one material, you can have several production versions for various validity periods and lot-size ranges.
Is SAP PI easy? ›SAP PI allows the user to maintain all the connections in one place by forming an easy integration system. With this module, any learned user can build his/her own integration process without any difficulty. Studying and understanding SAP PI/PO is simple but you need to be completely focused on the system.
Is SAP PI outdated? ›SAP PI 7.4 will be discontinued December 31st 2020 so it might better idea to upgrade to 7.5.
What qualifications do I need to be a SAP? ›All Eligibility Requirements for Different SAP Certifications. There are no specific requirements for the Associate level SAP certifications. Applicants just need to be graduates (BTech, B.Sc. or B.Com graduates can benefit more) or have a Master's degree. Computer knowledge will be essential though.
How do I get hired in SAP? ›
- Preparation. Get to know us better. Learn if SAP is the right fit for you. ...
- Application. Tailor your CV. Study the requirements in the job description and tailor your CV accordingly. ...
- Interviews & Assessments. Screening. ...
- Offer. Welcome to SAP.
Average starting Salary for SAP Consultant in India is around ₹3.0 Lakhs per year (₹25.0k per month). 2 years of minimum experience is required to be a SAP Consultant. What is the highest salary for a SAP Consultant in India? Highest salary that a SAP Consultant can earn is ₹14.9 Lakhs per year (₹1.2L per month).
What are the three types of master data in SAP? ›These records are created centrally in the SAP system using transaction XD01. Customer master data consists of three views: General data, Sales Area data, and Company Code data.
What are MRP areas in SAP PP? ›The MRP area allows you to have specific control over the staging and procurement of important parts produced in-house and purchased parts for each shop floor area . You can, however, also plan the provision of components for the individual subcontractors .
What is the BOM in SAP? ›A Bill Of Material in SAP is a detailed list of components with their quantities that you require in SAP Controlling. You need these components to manufacture X units of a Product.
What are the key skills for SAP? ›- Managing public and hybrid multi clouds. ...
- Integration and management of SAP SaaS solutions. ...
- AIOps. ...
- ServiceNow (and CMDB in particular) ...
- Basis automation. ...
- Orchestration automation. ...
- Kubernetes and containerization.
A few common examples of SAP modules include: SAP Controlling (CO) SAP Financial Accounting (FI) SAP Human Capital Management (HCM)
What are SAP functional skills? ›Functional modules in SAP are the modules that provide features your business wants. They process orders, track inventory, handle human resources, turn raw data to business intelligence and so on.
What are the procurement steps in SAP? ›- Step 1: Define Purchase Organization. ...
- Step 2: Define Purchase Group. ...
- Step 3: Define Plant. ...
- Step 4: Maintain FI Master Data For The Vendor. ...
- Step 5: Maintain Vendor Data. ...
- Step 6: Maintain Material Master. ...
- Step 8: Create Purchase Requisition. ...
- Step 9: Create Purchase Order.
- Converting planned order to production order.
- Releasing the production order.
- Goods Issue for production order.
- Confirmation of production order.
- Goods Receipt against production order.
What is the difference between process order and production order in SAP PP? ›
SAP process orders provide you with extra functionality compared to production orders, including phases and process instructions for process industries. When you use production orders, a routing and a bill of material (BOM) are transferred to the master data of the order header.
What are the 7 stages of procurement? ›- Assess your company's outsourcing needs. ...
- Compare outsourced market options. ...
- Use strategic sourcing to choose your suppliers. ...
- Choose supplier and negotiate contract terms. ...
- Implement and integrate vendor collaboration. ...
- Review vendor performance. ...
- Keep accurate records of vendor invoices.
- Open tendering procedure.
- Restricted procedure.
- Competitive dialogue.
- Competitive procedure with negotiation.
- Negotiated procedure without prior publication.
- 1 – Identifying need. The procurement process always starts with the same component – need. ...
- 2 – Supplier evaluation and selection. ...
- 3 – Purchase order. ...
- 4 – Delivery.
The production process definition refers to changing inputs into outputs. The main types are Mass production, Batch production, job production, just-In-Time production, and flexible manufacturing system.
What are the 4 parts of the production process? ›- Step 1 of Product Manufacture: Tool Making.
- Step 2 of Product Manufacture: Mass Production.
- Step 3 of Product Manufacture: Assembly.
- Step 4 of Product Manufacture: Packaging.
Determination of Requirement
This is the first step in a procurement cycle. It is the logical subdivision, where it is determined what material or services are required by the company, and which supplier can fulfill the requirement.
In general, there are three different types of production orders you can make with factories – made to stock(MTS), made to order(MTO), and made to assemble(MTA).
Can we create a production order without BOM and routing in SAP PP? ›Q . 1 Can we create Production order without BOM and routing? Yes we can create a production order without BOM & routing. Change the Config in OPL8 (order type dependent parameters) as routing optional.
How do I create a process order in SAP PP? ›- Step 1 − Use T-Code: CO01 or go to Production → Production Control → Order → Create → with material.
- Step 2 − Enter the material code for which the production order needs to be created.
- Step 3 − In the next window, input the order quantity.
How many types of BOM are there in SAP PP? ›
There are four types of BOMs in SAP Business One.